Vue lecture

Bridge returned error 400! (20686)

Details

Type: ClientException
Code: 400
Message: Invalid parameters value(s): data_source
File: lib/utils.php
Line: 256

Trace

#0 index.php(73): RssBridge->main()
#1 lib/RssBridge.php(39): RssBridge->{closure:RssBridge::main():37}()
#2 lib/RssBridge.php(37): BasicAuthMiddleware->__invoke()
#3 middlewares/BasicAuthMiddleware.php(13): RssBridge->{closure:RssBridge::main():37}()
#4 lib/RssBridge.php(37): CacheMiddleware->__invoke()
#5 middlewares/CacheMiddleware.php(44): RssBridge->{closure:RssBridge::main():37}()
#6 lib/RssBridge.php(37): ExceptionMiddleware->__invoke()
#7 middlewares/ExceptionMiddleware.php(17): RssBridge->{closure:RssBridge::main():37}()
#8 lib/RssBridge.php(37): SecurityMiddleware->__invoke()
#9 middlewares/SecurityMiddleware.php(19): RssBridge->{closure:RssBridge::main():37}()
#10 lib/RssBridge.php(37): MaintenanceMiddleware->__invoke()
#11 middlewares/MaintenanceMiddleware.php(10): RssBridge->{closure:RssBridge::main():37}()
#12 lib/RssBridge.php(37): TokenAuthenticationMiddleware->__invoke()
#13 middlewares/TokenAuthenticationMiddleware.php(10): RssBridge->{closure:RssBridge::main():33}()
#14 lib/RssBridge.php(34): DisplayAction->__invoke()
#15 actions/DisplayAction.php(54): DisplayAction->createResponse()
#16 actions/DisplayAction.php(88): BridgeAbstract->setInput()
#17 lib/BridgeAbstract.php(163): throwClientException()
#18 lib/utils.php(256)

Context

Query: action=display&bridge=BlueskyBridge&data_source=getAuthorFeed&user_id=tristankamin.bsky.social&feed_filter=posts_and_author_threads&include_reposts=on&format=Atom
Version: 2025-08-05 (git.master.309af5b)
OS: Linux
PHP: 8.4.24

Go back

mruac

  •  

Township Fights Nuclear Weapons Data Center By Passing a Moratorium on Electrical Infrastructure

Ypsilanti Township, Michigan, has imposed a six-month moratorium on "major electric utility infrastructure" in its latest attempt to delay a proposed $1.2 billion University of Michigan-Los Alamos data center that would support nuclear-weapons research. Township leaders, who have already paused water service for data centers, say the project has moved forward without adequate consultation and want more time to study noise, grid impacts, and other effects on residents. 404 Media reports: Last year, the university announced it was partnering with LANL on the construction of a massive 220,000 square foot hyperscale data center in Ypsilanti Township and residents have been fighting it ever since. During a meeting of the Township Board on August 18, the council unanimously passed a resolution that will delay the construction of new electrical infrastructure for 180 days. Data centers need a lot of energy, and Michigan's power authority will have to build new substations in the Township to power the proposed facility. The moratorium asked the local power authorities to use the six month delay to study noise pollution and how the new infrastructure would affect existing customers. The moratorium is narrowly focused on "the nature and scale of electrical infrastructure necessary to serve new high-energy-demand land uses [...] including infrastructure associated, but not limited to hyper-scale data centers, mid-sized data centers, artificial intelligence computing facilities, and high-performance computational centers, industrial facilities, and other intensive electrical users." Earlier this month, the University of Michigan announced it had settled on a specific plot of land in Ypsilanti Township -- a 144-acre plot on Textile Road. In a press release about the decision, the University said the data center would have the "capacity to change the world" and insisted it would not be a "high value target risk" in a war, that it would not store any hazardous nuclear material, and was not a weapons production facility. LANL previously confirmed that the data center will be used for nuclear weapons research. Ypsilanti Township Supervisor Brenda Stumbo told WEMU news that the selection of the site was a "travesty of justice" because it ignores constituents' concerns about environmental impact. During the August 18 moratorium vote, the Board projected a large stock photograph of an electric substation behind its members. The photo was meant to remind people of the size of the incoming infrastructure and the lack of communication from the university about it. "This picture's really important to think about because U of M has been so crystal clear that they've been communicating to us abundantly -- which is not true," Township clerk Debbie Swanson said during the meeting. "That speaks to the lack of respect."

Read more of this story at Slashdot.

  •  

134° - Montre Timex Expedition Field 43mm

40€ - Privé by Zalando

Boîtier rond de 43 mm en laiton noir agrémenté d’un bracelet écologique vert en deux pièces avec fermoir à boucle
Affichage analogique vert avec chiffres a...
  •  

L’OM ouvre la saison de Ligue 1 avec une large victoire contre Strasbourg

Un doublé d’Amine Gouiri et des buts de Keyliane Abdallah et Pierre-Emile Hojbjerg ont permis à Marseille, sans recrue, de l’emporter largement (4-0) pour le premier match officiel de son nouvel entraîneur, Bruno Genesio.

© MANON CRUZ/REUTERS

But sur penalty du Marseillais Amine Gouiri, lors du match de Ligue 1 entre l’Olympique de Marseille et le RC Strasbourg, au Vélodrome, le 21 août 2026.
  •  

EN DIRECT, guerre en Ukraine : à Kryvy Rih, une frappe russe visant un centre commercial fait au moins quinze morts, dont des enfants

L’attaque a aussi fait au moins 130 blessés, dont 23 enfants. Quatre personnes, dont trois mineurs, ont également été tuées dans une frappe séparée dans la région de Mykolaïv (sud) qui a causé un incendie dans un magasin, une pharmacie et un bureau de poste, selon le ministère de l’intérieur ukrainien.

© SERVICE UKRAINIEN DES SITUATIONS D’URGENCES/AFP

Des pompiers combattent l’incendie provoqué par une frappe de drones russes sur un centre commercial de Kryvy Rih (Ukraine), le 21 août 2026.
  •  

Salle de bal de la Maison Blanche : la Cour suprême américaine autorise temporairement la reprise des travaux

La haute cour, saisie la semaine dernière par l’administration Trump, a bloqué de manière temporaire un jugement prononcé le 7 août par une cour d’appel fédérale, qui ordonnait la suspension du chantier.

© EVAN VUCCI/REUTERS

Les travaux de construction de la salle de bal, à côté de la Maison Blanche, à Washington, DC, le 20 août 2026.
  •  
❌